Alright.. for today I got the interior ceiling panels of the bus removed completely, as well as trim. The roof unit has been set in place. A couple of pipes have been run inside the bus but will be covered up once the coving and roof panels are back in. I have the switches ready to be installed.
Tomorrow I'll finish mounting the unit and run a couple more pieces of tubing. I'll try to get it wired up as well.